|
|||
| Southern Lotus Register | |||
|
|
Mr Boats Factory Tour
| ||
Grant took us through the Lay-Up facility at Fi-Glass Ltd which is part of Mr Boats and is where the gel-coat is applied to the moulds before the fibre glass strands are layered with resin from a chopper gun then hand rolled to remove any airbubbles that could create a weakness in the finished product. The process usually takes 3 days to produce a deck and a hull together before they are shifted to the finishing factory |
Mr Boats generally have about 30 boats Grant Harman |
Copyright © Southern Lotus Register